Featured Posts

Pump Station “F” Project with Coral Gables

 

The City of Coral Gables has requested 300 Engineering to provide engineering services for the design and construction of the City’s PS “F”.  Services to be provided by 300 Engineering include planning, design, permitting and procurement support services.

 

Upgrades to the pump station are needed to maintain it operating under the United States Environmental Protection Agency (USEPA) 10-hour NAPOT Criteria, while upsizing the hydraulic capacity and electrical equipment.  

 

Please reload

Contract Awarded | Small Pipe E15-WASD-03A As Prime

March 1, 2017

1/7
Please reload

Recent Posts
Please reload

© 2017 by 300 Engineering Group, P.A.

  • Instagram 300 Engineering
  • Facebook Social Icon
  • LinkedIn Social Icon