top of page

South Miami Heights Water Main Replacement and Meter Conversions Design Build Criteria Package 

PROJECT  

HIGHLIGHT

Project Owner

Miami-Dade Water and Sewer Department 

 

Location

Miami-Dade County, FL

 

Main Services

  • Design/Build criteria package preparation

  • GIS Cadastral services

  • Utility coordination

  • Scheduling 

  • Opinion of Probable Cost (OPC)

Design/Build Criteria Professionals for the replacement of outdated and deteriorated water mains in the South Miami Heights Area. Services provided by 300 included but were not limited to, utility coordination support, as-built review, cadastral support, quantities take-off, opinion of probable cost (OPC), field observation support, limited permitting services and scheduling.  The project was divided into two (2) phases bounded by SW 168th St & SW 191st Ter and SW 127th Ave & SW 113th Ave.  The Lineal Footage of water main replacement for the overall project is 149,807 LF.  A total of 2,800 water meters are to be installed within the overall project.  Moreover, 1,943 of these meters are to be relocated from the rear to the front of the property.  In addition, 300 provided procurement support services to the Miami Dade Water and Sewer Department assisting during the design-builder team selection and contract negotiations.

bottom of page