Standard Operating Procedures Review and Optimization 

PROJECT  

HIGHLIGHT

Project Owner

Miami-Dade Water and Sewer Department 

 

Location

Miami-Dade County, FL

 

Main Services

  • Procedure review

  • Personnel interviews

  • Procedure analysis

  • Procedure redesign

  • Generation of flowchart diagrams

  • Resources study

  • Staffing analysis projections

  • Solutions and recommendations

  • Lean Methodology

300 Engineering was selected by the Miami-Dade Water and Sewer Department to provide assistance and engineering services to review, analyze, optimize and provide recommendations for the business process from As-builts to GIS.  WASD required assistance to optimize the business procedure from the reception of As-builts until digitized in Geographic Information System (GIS).

 

300 Engineering utilized the following Lean Methodology tools in the analysis of this business process:

•  Value Stream Mapping

•  Pareto Diagrams

•  Spaghetti Diagrams

 

By means of these tools 300 Engineering was able to obtain critical information regarding the current needs for process improvement in terms of reduction of Lead times and a shift from Batch to Continuous Flow of information.