Pump Station and Force Main Upgrades to Journey’s End Pump Station in Coral Gables
300 Engineering was selected by the City of Coral Gables to provide engineering design services for the upgrade of their Journey’s End...
MIA Wastewater Hydraulic Model Calibration
300 Engineering is assisting the Miami Dade Aviation Department (MDAD) as part of ISD Contract E15-MDAD-02 “Sanitary Sewer Master Plan”...
Pump Station “F” Project with Coral Gables
The City of Coral Gables has requested 300 Engineering to provide engineering services for the design and construction of the City’s PS...
City of Opa-Locka Water Distribution Operations Assessment & Optimization
The City of Opa-Locka’s Water Distribution serves an area of approximately 3 square miles and has approximately 5,000 service...
Contract Awarded | Small Pipe E15-WASD-03A As Prime
Engineering design and related services for the design of a small diameter water and wastewater pipelines for the water and sewer...