Port Miami Water Distribution System Analysis and Upgrades Recommendation


As part of the Miami-Dade Water and Sewer Department’s Integrated Master Plan, 300 Engineering is providing engineering and GIS services to update the hydraulic model for the Port Miami water distribution system. As part of this project, 300 Engineering is performing data collection and review, field investigation, updating the GIS Database and Opinion of Probable Construction Costs Class 5 for upgrades to the transmission water main system owned and operated by WASD within the Port Miami limits. 300 Engineering is also assessing the feasibility of upgrading an 8-inch water main along the cruise terminal wharf. The project is planned to be completed by the end of this year.